Alveley Sidings

164 bytes added, 19:11, 7 March 2021
Preservation: Electronic ‘tilt monitoring’ equipment was fitted in February 2021
In 1996, [[Country Park Halt]] was opened on the site. The river bridge linking the main country park on the east bank with the Halt on the SVR was replaced in 2006.<ref>[https://www.transportxtra.com/publications/local-transport-today/news/7072/highley-alveley-footbridge-shropshire News article on www.transportxtra.com]</ref> It is also used by [[National Cycle Route 45]].
Following [[Severn Valley Railway Timeline 2020-2029#2020|extensive flooding in February 2020]] land movements were observed in Alveley Woods. {{As of|2020|6}} a drainage scheme is planned, to reduce the amount of water reaching the slip plane and take a degree of pressure off the embankment. A second phase will include a mixture of soil nailing and partial replacement of the embankment material and is likely to take place during 2021.<ref>[https://www.svrlive.com/bljun20 Branch Lines, June 2020] (Retrieved 26 June 2020)</ref> {{As of|2020|08}} a 5 mph temporary speed restriction is in force in the affected area. Electronic ‘tilt monitoring’ equipment was fitted in February 2021<ref>[https://www.svrlive.com/blmar21 Branch Lines, March 2021] (Retrieved 7 March 2021)</ref>.
== Photographs ==
Trustworthy, administrator
6,533
edits

Navigation menu