Changes

Severn Valley Railway Timeline 2020-2029

23 bytes added, 23:09, 25 January 2023
m
2023: tidy links etc
==2023==
2023 saw the Railway announcing voluntary redundancies, cost savings and a reduced four days a week peak service in the face of nationwide reduced footfall, economic contraction and a cost-of-living crisis. It coincided with the resignation of [[Helen Smith]] as managing directorManaging Director. The year marked the 60th anniversary of the official closure of the SVR north of Bewdley. Another ‘must-do’ engineering project was starting, with phase 1 of the relaying of [[Bridgnorth MPD|Bridgnorth Loco Works' yard]].
'''January 2023'''
*On 2 January [[1501]] and [[2857]] both came out of traffic at the expiry of their boiler tickets.
*[[SVRHSVR(H)]] vice-chair Jonathan Dunster was appointed interim managing Managing Director. *On 10 January an allotment of shares took the [[SVRHSVR(H)]] issued capital to £11,000,457.
*Phase 1 of the relaying of Bridgnorth Loco Works' yard started.
Trustworthy, administrator
11,923
edits