November 19

From SVR Wiki
Revision as of 17:18, 19 November 2017 by Robin (talk | contribs)
Jump to: navigation, search

On November 19 in SVRSevern Valley Railway history.

  • 1977 Black 5 45000 arrived on loan from the NRMThe Railway Museum, formerly the National Railway Museum for restoration.[1]
  • 1986 After two days in court, the SVRSevern Valley Railway obtained a judgement allowing boiler riveting to continue at Bridgnorth during weekday working hours for the next two years. This period would allow time for the construction of Bridgnorth boiler shop.[2]
  • 1990 The morning's planned fully loaded test run of Stanier mogul 42968 (LMSLondon Midland & Scottish Railway 2968) from Bridgnorth to Kidderminster was terminated at Highley due to a bomb scare at the BSCBritish Steel Corporation, or British Sugar Corporation Foley Park factory.[3]

See also

On this day in SVRSevern Valley Railway history

← November 18 - November 20 →

References

  1. SVRSevern Valley Railway News 52
  2. SVRSevern Valley Railway News 83
  3. SVRSevern Valley Railway News 98