March 19
From SVR Wiki
Revision as of 15:20, 4 July 2017 by Robin (talk | contribs) (Created page with "On {{PAGENAME}} in SVR history. * 1972 The telegraph pole route between Bridgnorth and Hampton Loade was completed...")
On March 19 in SVRSevern Valley Railway history.
- 1972 The telegraph pole route between Bridgnorth and Hampton Loade was completed with the erection of the final pole near Sterns.
See also
On this day in SVRSevern Valley Railway history